| Payment Type: | L/C,T/T | 
|---|---|
| Incoterm: | FOB,CIF,EXW | 
| Min. Order: | 500 Bag/Bags | 
| Delivery Time: | 35 Days | 
Additional Info
Packaging: 1pc/1ctn
Transportation: Ocean,Air
Port: Shenzhen
Product Description
CE built in gas hob
60cm hob with Front Control panel
Surface:8mm toughened safety glass
Cast iron pan stands
Base: 0.6mm cold rolled steel with painting
Automatic pulse ignition
Flame failure safety device on each burner
Loading quantity:540pcs/20GP 1140pcs/40GP 1292pcs/40HQ
	
Company Introduction
 
© 2019 CHINA WAY. All Rights Reserved. Xunda Science & Technology Group Co.ltd, Inc. All rights reserved. site map. sitemap.html